|
||
|
|
|
|
|
|
![]() |
![]() |
|
|
The goal of HVAC System is to provide proper Airflow, Heating and Cooling to each part of the area. The key criteria to achieve this goal are a quality system, accurate design, fabrication, proper installation and performance testing.
AKS has installed equipment, piping and Ducts according to design specifications, using installation requirements and procedures from the uniform mechanical code. AKS had executed one of the largest HVAC Systems of the country at Qaid-e-Azam International Airport.
AKS has an experience team of supervisors, Fabricators, Fitters, Insulators and other workers, who have executed the project all over the country like:
|
|
Head Office A-7, 4th FLOOR, AL-HAYAT CHAMBER, BLOCK 7/8, KCHSU, SULTAN AHMED SHAH ROAD, OFF SHAHRAH-E-FAISAL, KARACHI - PAKISTAN PH: 92+21-4545380, 4535793, 4386842 FAX: 92+21-4529630, EMAIL: info@akseng.com akseng@super.net.pk aks-eng@hotmail.com
|